Robert E. Isenhour 9138 Bronco Dr. Houston, Texas 77055 832-754-1361 SUMMARY
Project Analyst II Controls I possess great managing skills as seen
below. Read P&IDs know vessels, reactors,
pumps, tanks, heaters and agitators Land pipe line 36” schedule covering
complete details from FERC requirements, land right of ways, engineering and
construction. I want more really enjoyed it. Subsea and land pipeline scheduling
Re-route project. Expediting long lead items valves, wyes and flanges. I have experience of 6 plus years in
Primavera P6 developing and updating level 1 thru 4 schedules. Also can use Microsoft Project Recently assigned to take on the scheduling
duties of a major project on the BP GOM Accomplished developer and user of excel
spreadsheets as demonstrated by the activities so listed below. Developed
curves for progress and others processes as also listed below. Also Icicle
graphs for tracking progress. Assigned on the BP GOM fleet department,
was the only scheduler of three for several months handling all fleet
projects. Roughly 15 different schedules for 7 different hubs or platforms. Recent working with P6 developing level 4
schedules, while at the same time developing road maps and RDI schedules
using Excel and charts. Enter acting with all disciples to get their input. First assignment for WP - ERA schedule and
RDI progress reporting procedures on the A-D Sakhalin Project for the ERA
work group. Accomplished planner/scheduling
professional with thirty plus years of increasing responsibility. Very detail
oriented and precise in operational procedures. I originated a scheduling
department to sixteen people and one supervisor while managing
multimillion dollar project. Solid in forming and maintaining customer,
vendor and client relationships, working with purchasing, engineering,
shipping, warehousing, and production. Project was on time and under budget. EXPERIENCE
July 28, 2014 to Feb. 3, 2015 DIVERSIFIED
PROJECTS, INC. Project
Scheduler
Project – Gas Compressor Station-N. Dakota and Pennsylvania
Convert Microsoft Project into Primavera P6 Schedule
Developed schedule for 50 MMCFD gas compression
Produce Man-hour curves from
man power histograms for each discipline
Can update progress in P6 using physical, duration, or unit percent complete
Dec. 2, 2013 to July 25, 2014
Project Scheduler Ventech Engineers International, LLC Revived a project on hold for 2 months,
scope reduced by 66%, deleted
activities, revised logic, and completed within client due
date. Learn new company system, track vendor
data, making equipment list,
maintain
procurement log and % complete, Learn to read P&IDs, fill out tracker
templet for pipe, valves, welds by type, & etc. Also did the same for
instrumentation off of P&IDs. Work
another project which was in a similar situation.
BP GOM ECII Fleet department Seven
different Hubs or Platforms Duties basically the same as above. One
major difference was that all updates came from the PEs, which there were two
with whom I worked. I was covering approximately 15 different
schedules for several different projects across three to six Hubs. Boemre
Vents, Corrosion Inhibitors and Crane Reliability Study and Installation.
Project – A-D Sakhalin Project
Offshore Platform Associate Project Controls Scheduler My main duties are: Develop
ERA schedule to a detailed level 3-4 using P6 Design
spreadsheets at Supervisor’s request Gather
information from engineering coordinators to provide information of progress Interact
with Client representative to provide their requirements Worked
with preliminary schedule for telecommunications Work
with the ERA RDI’s from Russia to develop their schedules Assigned
to Commissioning to Develop the Hook Up Commissioning schedule 9/15/09
to 1/4/10 Assigned
to do the Progress Curves, Man-hour, Monthly & Productivity Reports plus
doing the Procurement Icicle Charts 1/4/2010 to Present Presently
updating and distributing project progress curves on a weekly basis to WP and
ENL management. Providing plotted poster and posting around the discipline
offices. Providing
discipline progress percentages by cumulative and weekly time frame by poster
around the project offices. Updating
Rubin activity report on a weekly basis. onthly
PIP (Project Incentive Plan) report and level one schedule for monthly
report. Assisting
in the updating of the Rubin Schedule on a by-weekly basis. Providing
monthly progress curves, man-hour, level one, discipline progress and MPRD to
Reporting Coordinator.
Lyondell Citgo, Pasadena
Planner/Scheduler GF-2 maintenance schedule for turnaround Bay City Hoechst Celanese Planner/Scheduler
PS-7 Designed cost report spreadsheet using excel and bar charts,
handled change orders, estimated pipe and wiring
. EDUCATION
MBA, Lindenwood University, 1986 BS, Business, Tarkio, 1982 REGISTRATIONS/AFFILIATIONS
Institution membership Society membership PUBLICATIONS/PRESENTATIONS
Papers or articles in industry publications Papers presented at industry conferences Books written for the industry SPECIFIC
TECHNICAL EXPERTISE/SPECIALIST COURSES
State specific areas of technical expertise
that will assist with selling services to clients. List key specialist courses attended that
will assist with selling services to the clients.
|
|||||||||||||||||||||||||||||||||||
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|